Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 11 results ...

Amir, T (1986) Transient Response Analysis of a Dual Cycle System. Journal of Construction Engineering and Management, 112(03), 403–10.

  • Type: Journal Article
  • Keywords: Transient response; Productivity; Construction methods; Efficiency; Estimation;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1986)112:3(403)
  • Abstract:
    The increasing competition in the construction industry today not only calls for lower bid prices but for accurate estimates as well. Therefore, a contractor must continuousiy strive to improve his or her estimating techniques. A computer simulation which can be used to estimate the loss in efficiency that results when a dual cycle system is being started up each shift is presented. It does this by using the CYCLONE simulation model for several different simulated cases.

Arditi, D and Albulak, M Z (1986) Line‐of‐Balance Scheduling in Pavement Construction. Journal of Construction Engineering and Management, 112(03), 411–24.

Bresnen, M J, Bryman, A E, Ford, J R, Beardsworth, A D and Keil, T E (1986) Leader Orientation of Construction Site Managers. Journal of Construction Engineering and Management, 112(03), 370–86.

Handa, V K and Barcia, R M (1986) Linear Scheduling Using Optimal Control Theory. Journal of Construction Engineering and Management, 112(03), 387–93.

Herbsman, Z (1986) SERC—A Model for Estimating Construction Inputs. Journal of Construction Engineering and Management, 112(03), 425–39.

Kagan, H A, Leary, D J and Pratter, G E K (1986) Design Engineers' Responsibilities During Construction. Journal of Construction Engineering and Management, 112(03), 394–402.

Karaa, F A and Nasr, A Y (1986) Resource Management in Construction. Journal of Construction Engineering and Management, 112(03), 346–57.

Thomas, H R and Bluedorn, A C (1986) Case Study of Organizational Changes. Journal of Construction Engineering and Management, 112(03), 358–69.

W. L., S, Rybel, V W and Cochran, L (1986) Dewatering for Opal Springs Powerhouse Excavation. Journal of Construction Engineering and Management, 112(03), 440–51.

William C., I (1986) Future Directions for Computerized Construction Research. Journal of Construction Engineering and Management, 112(03), 326–45.

Wong, T K and Logcher, R D (1986) Contractors in Cyclical Economic Environments. Journal of Construction Engineering and Management, 112(03), 310–25.